Company Profile
HDHPC has two run-of-the-river hydropower projects: 4.455 MW Mai Khola Small Hydroelectric Project (MKHP) operational since February 13, 2011 and 8 MW Mai Khola Cascade Hydroelectric Project (MKCHP) operational since April 19, 2018. Annual contracted PLF for MKHP and MKCHP are 70.54% and 68.99% of their respective installed capacities.
P/E RatioN/A
Market Cap5.76B
Volume Traded98.5M
AI Technical Analysis
Daily OutlookRSI (14)54.20Neutral
MACDBullishPositive Crossover
BollingerMiddleTrading Range
ADX22.50Weak Trend
Last Updated: 26-02-04 14-59-59 | Shares Traded: 493640
Want Deeper Analysis?
Unlock AI-powered buy/sell signals, detailed financials, and real-time alerts for HDHPC.
Open in Mobile App